Discuss a project →
BA Academy · Buying & comparing

Can procurement swap in another "EI 60" glass?

Lesson 6 of 11 · for procurement and tender teams

Not on the label alone. Two EI 60 glasses can have different thicknesses, interlayers, edge details and expansion behaviour, and each one was tested in a particular frame. A replacement needs evidence covering it in the proposed frame, at the proposed sizes, and the approval the contract requires before it is ordered.

By Josh Astin, British Aluminium · Updated 27 November 2026

Why substitutions go wrong

Substitutions usually happen late, under cost or lead-time pressure, and often by people who did not write the specification. The new product looks the same on the quote, but its evidence may cover a different frame, smaller sizes or a different class. This is one of the main reasons fire-rated glazing is rejected at inspection.

A safe substitution

The bidder submits the evidence for the new combination. The consultant compares it with the specification and the opening schedule and approves it in writing. The approval is kept with the project records so the inspector can see it.

What to ask the bidder

  • Is there test evidence for the new glass in the offered frame?
  • Does it cover the same class, minutes and sizes?
  • Has the consultant approved it in writing?

Questions buyers ask

Is a "like-for-like" statement enough?

No. Like-for-like has to be shown with evidence for the combination being installed.

Who is responsible if a substitution fails?

Usually whoever proposed and accepted it without evidence. Keep the approval record.

Related

About British Aluminium

British Aluminium designs and manufactures fire-rated, bullet-resistant, blast-resistant and anti-attack glazing, doors and windows in aluminium and steel. Made in the GCC, for projects in Qatar, Saudi Arabia, Oman and export markets. BA Academy is our series of short lessons for architects, consultants, contractors and procurement teams.

Comparing offers on a live tender?

Send the specification and the offers you have received. We will tell you which tested systems match the requirement.